What is measured in the survey
- Wireless coverage: signal and noise level in rooms, corridors and open areas; channel congestion from neighboring networks
- Physical structure: wall type, number of floors, cabinet location, existing cabling
- Device inventory: switch, router, access point; model, age, software version
- Usage: number of concurrent users, camera and IoT devices, VoIP, guest traffic
The seasonal peak in hotels, the distance between buildings in residential complexes and the transitions between floors in offices determine the focus of the survey. In all of them, the number of access points cannot be stated without measurement; the "let’s add one more device" approach usually makes the problem bigger.
What is asked in the survey
- What is the most common complaint today: dropouts, slowness, no signal in certain areas?
- Are the guest, staff and camera networks separate?
- How many internet lines are there; is there a backup line?
- Who holds the network diagram and the passwords?
- What will change in the coming year: a new block, a new branch, a new camera system?
What the survey report contains
The output of the survey is a written current-state and needs report. The report contains the measurement results, the inventory, the problems identified and the recommended direction for the design. The proposal is based on this report, so it is clear what the scope was based on.
From report to design
In the design phase, the topology, the IP and VLAN plan, the device list and the migration plan are prepared. The separation of the guest network from the business network in hotels, the redundancy of the links between buildings in residential complexes and authentication (802.1X) in offices are typical topics of the design. Implementation starts after the design is approved.
Projects outside Alanya and Antalya
Network projects are implemented on site across Türkiye. For projects outside Alanya and Antalya, the plan for the on-site survey and implementation is written in the proposal together with its cost.
Frequently asked questions
What should we prepare for the survey?
The location address, the approximate number of users and devices, the existing device list if there is one and the main problem you are having are enough. Access to the cabinet and the devices is needed on the day of the survey.
Can we get a proposal without a wireless measurement?
In wireless network projects, the number and placement of access points cannot be determined without measurement; that is why an on-site survey is carried out.
In a hotel network, does guest traffic affect the business network?
Not when it is separated by a separate virtual network (VLAN) and access rules. This separation is part of the design and is verified in the acceptance test.
Related service: Network Design and Implementation. Office, hotel, campus and field site networks; wired and wireless.