Network fault first-analysis workflow
Target level: approved action · 6 steps
- TriggerThe monitoring system raises a connection loss alert at a branch.
- CollectionThe agent collects interface, routing and log information from the relevant routers and switches with read-only access.
- AnalysisIt correlates alerts from the same minute and lists the likely cause with evidence.
- RecommendationIt prepares the configuration diff and the rollback steps for the fix.
- ApprovalThe change goes to the network owner for approval; it is not applied without approval.
- LogEvery read and action is logged; the incident report goes to the team.
