Restore test report
Scheduled test · 1 system
- System
- Accounting server (virtual machine)
- Backup schedule
- Daily; retention period in the proposal
- Test method
- Restore from backup to a separate environment
- Target time
- Written together in the proposal
- Measured time
- Measured in the test and written in the report
- Check
- Application started; date of the last record verified
